Skip to content

Continue live work while a change set is open

Live remains editable while a change set is open, if you hold Edit live. See Change sets.

  1. Leave the change-set context and choose Live. Check the green band before editing. Opening another browser tab can help keep the contexts distinct.
  2. Make and save the immediate correction. It is visible in Live now; it does not update the starting copy inside the existing change set.
  3. Return to the change set and review its changes. An unrelated new Live record or a Live correction to an untouched record is kept when the change set publishes.
  4. Validate and attempt publication only after reviewing current work. If Live and the change set changed the same record, publication refuses the conflict even if different fields changed. Changed mapping sets and invalid combined relationships can also stop publication.
  5. Read the conflict list. Both Live and the change set remain intact, and nothing is partially published. Prepare a new change set from current Live and reapply the intended corrections after reconciling them. There is no automatic rebase or forced overwrite through retry.

Another publication between review and confirmation can also make the attempt stale. Refresh and inspect the current result before retrying.